< Back to Case Studies
15.02.16
Case study
Brief:
To design, tender, project manage and witness the physical security the new Datacentre in the Midlands for a major UK bank.
Project details:
HVM (Hostile Vehicle Mitigation), fence, turnstiles, PAS 68 crash rated gates, security portals, perimeter detection systems, access control, CCTV systems and control room.